A platform for research: civil engineering, architecture and urbanism
Description of reinforced-concrete bridge 42.5 m. long with 5 spans built over Pontia River in Malay State, Jahore; as river bottom was very soft, special concrete piles with mushroom caps were used.
Description of reinforced-concrete bridge 42.5 m. long with 5 spans built over Pontia River in Malay State, Jahore; as river bottom was very soft, special concrete piles with mushroom caps were used.
Pile Foundations in Swampy Regions
Paelefundering i Sumpegne
Lamm, A.R. (author)
Ingenioren ; 38
1929
2 pages
3 Figs.
Article (Journal)
Danish
© Metadata Copyright Elsevier B. V. All rights reserved.
Equipment Tackles Swampy Drainage
Online Contents | 1998
|Controlling Swampy Odors in Drinking Water
Wiley | 1988
|Underpinning new buildings on swampy soil
Engineering Index Backfile | 1914
Shallow foundations on muddy and swampy land and reconstruction by the aid of such treatment
Engineering Index Backfile | 1913
|Ground water control in a swampy town
British Library Conference Proceedings | 1993
|