A platform for research: civil engineering, architecture and urbanism
Competitive design for combined bridge over the Elbe at Tangermuende
Features of Ost-West design of steel-plate girder bridge 833 m. total length; 15 m. total width, including one railway track, and pedestrian walk 2.6 m. wide; maximum span of 110 m. is made up of arch ribs in addition to plate girder.
Competitive design for combined bridge over the Elbe at Tangermuende
Features of Ost-West design of steel-plate girder bridge 833 m. total length; 15 m. total width, including one railway track, and pedestrian walk 2.6 m. wide; maximum span of 110 m. is made up of arch ribs in addition to plate girder.
Competitive design for combined bridge over the Elbe at Tangermuende
Der Brueckenwettbewerb fuer die Erbauung einer Strassen- und Eisenbahnbruecke ueber die Elbe bei Tangermuende
Foerster, M. (author)
Bauingenieur ; 10
1929
5 pages
5 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Competitive design for new highway bridge over the Elbe at Meissen
Engineering Index Backfile | 1929
|Competitive designs for bridge over Elbe River at Tangermuende
Engineering Index Backfile | 1929
|Competitive design for new highway bridge over the Elbe at Meissen
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1945
|Preliminary design of bridge over Elbe River at Tangermuende)
Engineering Index Backfile | 1929
|