A platform for research: civil engineering, architecture and urbanism
Pittsburgh to develop airport under difficult conditions
Mountainous terrain necessitates site nearly 10 mi. from City Hall; heavy excavation required; location map; plans for grading and subgrading of area of 190 acres, necessitating 2,815,000 cu. yd. of excavation with maximum cut of 40 ft. and maximum fill of 73 ft.; estimated cost $1,515,200.
Pittsburgh to develop airport under difficult conditions
Mountainous terrain necessitates site nearly 10 mi. from City Hall; heavy excavation required; location map; plans for grading and subgrading of area of 190 acres, necessitating 2,815,000 cu. yd. of excavation with maximum cut of 40 ft. and maximum fill of 73 ft.; estimated cost $1,515,200.
Pittsburgh to develop airport under difficult conditions
Eng. News-Rec
Ross, G.B. (author)
Engineering News-Record ; 103
1929
2 pages
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rock slope evaluation for Pittsburgh Airport Busway
British Library Conference Proceedings | 1998
|Power and light for greater Pittsburgh airport
Engineering Index Backfile | 1952
|Cathodic Protection of Fuel Pipelines Under Difficult Conditions at a Commercial Airport
British Library Online Contents | 2004
|Stormwater Management Program for the Pittsburgh International Airport
British Library Conference Proceedings | 1993
|