A platform for research: civil engineering, architecture and urbanism
A general review of the progress of work on this great tunnel through the Alps, from Jan. 1, 1901, to Jan. 1, 1903, with illustrations and tables. (Serial. 2 parts) (9000 w.)
A general review of the progress of work on this great tunnel through the Alps, from Jan. 1, 1901, to Jan. 1, 1903, with illustrations and tables. (Serial. 2 parts) (9000 w.)
The construction of the Simplon tunnel
Der Bau des Simplontunnels
Wagner, C.J. (author)
1903
1 Plate
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1901
Engineering Index Backfile | 1902
Engineering Index Backfile | 1895
Construction of Simplon tunnel II
Engineering Index Backfile | 1922
|Construction of Simplon tunnel II
Engineering Index Backfile | 1922
|