A platform for research: civil engineering, architecture and urbanism
An illustrated general description of the series of tests made on each of the alternators installed in the 74th St. station of the Interborough Rapid Transit Co., of New York City. (1800 w.)
An illustrated general description of the series of tests made on each of the alternators installed in the 74th St. station of the Interborough Rapid Transit Co., of New York City. (1800 w.)
Test of a 5,000 kw. alternator
Elec Club Jour
Gaillard, L.L. (author)
1905
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Figure Ground Comparisons (1:5,000)
Wiley | 2023
|Engineering Index Backfile | 1942
Cost analysis of $5,000 steel house
Engineering Index Backfile | 1937
|A Swiss 5,000-volt single-phase road
Engineering Index Backfile | 1911
|Rolling electrification - a 5,000 track km programme?
IuD Bahn | 2009
|