A platform for research: civil engineering, architecture and urbanism
A quickly erected reinforced concrete dam at Fenelon falls, Ont.
Brief illustrated description of an application of concrete-steel to the construction of dams of moderate height. A dam 194 ft. long and about 10 ft. high was built in 22 ordinary working days. (700 w.)
A quickly erected reinforced concrete dam at Fenelon falls, Ont.
Brief illustrated description of an application of concrete-steel to the construction of dams of moderate height. A dam 194 ft. long and about 10 ft. high was built in 22 ordinary working days. (700 w.)
A quickly erected reinforced concrete dam at Fenelon falls, Ont.
Eng News
1905
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Quickly Erected Buildings in Modern Construction
Trans Tech Publications | 2014
|