A platform for research: civil engineering, architecture and urbanism
Substructure work and erection of the shubenacadie bridge
This railway bridge crosses the river five miles from its mouth, where it is subject to very high tides. The conditions are described in an illustrated description of the substructure work given. (4300 w.)
Substructure work and erection of the shubenacadie bridge
This railway bridge crosses the river five miles from its mouth, where it is subject to very high tides. The conditions are described in an illustrated description of the substructure work given. (4300 w.)
Substructure work and erection of the shubenacadie bridge
Eng Rec
1904
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1898
|Erection of Columbia River Bridge erection
Engineering Index Backfile | 1894
Engineering Index Backfile | 1933
|BRIDGE ERECTION METHOD AND LAUNCHING MACHINE FOR BRIDGE ERECTION
European Patent Office | 2022
|Engineering Index Backfile | 1915