A platform for research: civil engineering, architecture and urbanism
The erection of the double track Mingo Cantilever bridge over the Ohio river
An illustrated description of an unusually difficult undertaking; a 700 ft. channel span crossing the Ohio River. (Serial. 1st part) (2000 w.)
The erection of the double track Mingo Cantilever bridge over the Ohio river
An illustrated description of an unusually difficult undertaking; a 700 ft. channel span crossing the Ohio River. (Serial. 1st part) (2000 w.)
The erection of the double track Mingo Cantilever bridge over the Ohio river
Eng Rec
1904
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The substructure of the Mingo bridge over the Ohio river
Engineering Index Backfile | 1903
Erection of balanced-cantilever bridge over Connecticut river
Engineering Index Backfile | 1938
Erection of balanced-cantilever bridge over Connecticut river
Engineering Index Backfile | 1938
Engineering Index Backfile | 1904
The Sewickley Cantilever Bridge Over the Ohio River
ASCE | 2021
|