A platform for research: civil engineering, architecture and urbanism
Lean mix can be laid rapidly by small labor force; minimum of supervision and control-testing needed; no deformation by subsequent compaction by traffic; mix design detailed; pavement thickness can be reduced; 8-10 ton rollers can compact 8 in. thick lean mix and heavy vibrating rollers are needed for 14 in. mix; bituminous curing; surfacing can be laid 3 days after completion of base.
Lean mix can be laid rapidly by small labor force; minimum of supervision and control-testing needed; no deformation by subsequent compaction by traffic; mix design detailed; pavement thickness can be reduced; 8-10 ton rollers can compact 8 in. thick lean mix and heavy vibrating rollers are needed for 14 in. mix; bituminous curing; surfacing can be laid 3 days after completion of base.
Lean-mix concrete bases
Surveyor
Blake, L.S. (author)
Surveyor ; 117
1958
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Lean mix concrete bases at Crawley
Engineering Index Backfile | 1957
|Lean concrete and soil-cement in road and airfield bases
Engineering Index Backfile | 1960
|Assessment of performance of dry lean concrete bases for roads
Engineering Index Backfile | 1968
|Resilient Modulus Testing of Lean Emulsified Bases
British Library Conference Proceedings | 1996
|Resilient Modulus Testing of Lean Emulsified Bases
British Library Online Contents | 1996
|