A platform for research: civil engineering, architecture and urbanism
Concrete-encased steel pier at deal
New pier has stem 900 ft long, made up of 18 50-ft spans supported by two-pile trestle bents; bents are formed by two raking steel box piles connected at their heads by single transverse member to form rigid portal frame.
Concrete-encased steel pier at deal
New pier has stem 900 ft long, made up of 18 50-ft spans supported by two-pile trestle bents; bents are formed by two raking steel box piles connected at their heads by single transverse member to form rigid portal frame.
UHPC ENCASED STEEL PIPE CONNECTOR FOR PREFABRICATED CONCRETE PIER AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2025
|A New FRP-Encased Bridge Pier Column
British Library Conference Proceedings | 1996
|Condition of steel encased in old concrete
Engineering Index Backfile | 1927
|Eccentrically loaded concrete encased steel composite columns
Online Contents | 2011
|Ductility Design of Concrete Encased Steel Piers
British Library Conference Proceedings | 2002
|