A platform for research: civil engineering, architecture and urbanism
A viaduct 250 ft. high erected without false works, by means of a suspension cable. (See also Discussion on p. 240.)
A viaduct 250 ft. high erected without false works, by means of a suspension cable. (See also Discussion on p. 240.)
Erection of the Verrugas Viaduct
Trans ASCE
Buck, L.L. (author)
1876
4 pages
Illustrations
Conference paper
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1909
The erection of the Bellevue Viaduct
Engineering Index Backfile | 1905
Erection methods, bloor street viaduct, Toronto
Engineering Index Backfile | 1916
|The erection of the Shepherdstown viaduct
Engineering Index Backfile | 1910
The erection of the Brandywine viaduct
Engineering Index Backfile | 1910