A platform for research: civil engineering, architecture and urbanism
The tunnel at Samos, described by Herodotus, surveyed in 1884 by Ernst Fabricius. The tunnel is 1,000 metres long and generally 1.75 metres square, approached by conduits aggregating 1,200 metres in length; partly in tunnel, partly in open cutting.
The tunnel at Samos, described by Herodotus, surveyed in 1884 by Ernst Fabricius. The tunnel is 1,000 metres long and generally 1.75 metres square, approached by conduits aggregating 1,200 metres in length; partly in tunnel, partly in open cutting.
Greek tunnel of the sixth century B. C.
Sch Mines Quar
Merriam, A.C. (author)
1885
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1995
First TBM tunnel for the Greek Railways
Online Contents | 1997
|Tunnel Construction, Sixth Avenue Subway, New York, NY
ASCE | 2021
|The future Speer/Sixth/Lincoln tunnel, Denver, Colorado
British Library Conference Proceedings | 1993
|