A platform for research: civil engineering, architecture and urbanism
Surveying railroads
Railroad Leveling, by means of two rodmen and a hand-car, whereby over 30 miles of levels are run in a day. Th. S. Hardee.
Surveying railroads
Railroad Leveling, by means of two rodmen and a hand-car, whereby over 30 miles of levels are run in a day. Th. S. Hardee.
Surveying railroads
Trans ASCE
1877
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1890
|Engineering Index Backfile | 1895
|ASCE | 2021
|Engineering Index Backfile | 1888
|TIBKAT | 2016