A platform for research: civil engineering, architecture and urbanism
Concrete "Pot-Shots" line difficult tunnel
To improve waterway system, Pacific Gas and Elec Co eliminated 12 mi of old canal by boring 4630-ft, 6×9-ft tunnel; equipment for concrete placing consisted of eight 1 1/4-cu yd Flocrete Placers which also transported concrete; lining supported by structural steel frame.
Concrete "Pot-Shots" line difficult tunnel
To improve waterway system, Pacific Gas and Elec Co eliminated 12 mi of old canal by boring 4630-ft, 6×9-ft tunnel; equipment for concrete placing consisted of eight 1 1/4-cu yd Flocrete Placers which also transported concrete; lining supported by structural steel frame.
Concrete "Pot-Shots" line difficult tunnel
Construction Methods Equipment
1954
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2011
Online Contents | 2012
Online Contents | 2012
Online Contents | 2011
Construction of a concrete sewer tunnel through difficult ground
Engineering Index Backfile | 1913
|