A platform for research: civil engineering, architecture and urbanism
Fast precasting schedule for record-size marine corps warehouses
Data on construction of 17 single story reinforced concrete warehouses with total net storage area of 2,400,000 sq ft, at Albany, Ga; with combination of high early cement and vacuum processing, 75% of specified design strength could be obtained within 24 hr in weather not under 45 F, and all shores could be removed under beams and struts within 24 hr.
Fast precasting schedule for record-size marine corps warehouses
Data on construction of 17 single story reinforced concrete warehouses with total net storage area of 2,400,000 sq ft, at Albany, Ga; with combination of high early cement and vacuum processing, 75% of specified design strength could be obtained within 24 hr in weather not under 45 F, and all shores could be removed under beams and struts within 24 hr.
Fast precasting schedule for record-size marine corps warehouses
Civ Eng (NY)
Dominy, J.A. (author) / Zollman, C.C. (author) / Pearce, H. (author)
1954
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1936
Precasting giant-size concrete panels
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1941
British Library Online Contents | 2006
|