A platform for research: civil engineering, architecture and urbanism
Chemical sealing stops leakage in tunnels of Pennsylvania turnpike
Procedure for drilling, and sealing by Lelite backfill and chemical solidification to stop leakage of ground water through construction joints and cracks in concrete linings of more than seven miles of Tuscarora Tunnel.
Chemical sealing stops leakage in tunnels of Pennsylvania turnpike
Procedure for drilling, and sealing by Lelite backfill and chemical solidification to stop leakage of ground water through construction joints and cracks in concrete linings of more than seven miles of Tuscarora Tunnel.
Chemical sealing stops leakage in tunnels of Pennsylvania turnpike
Civ Eng (NY)
Stickler, Jr., C.W. (author) / Allan, Jr., A. (author)
1954
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1940
|Engineering Index Backfile | 1940
|Engineering Index Backfile | 1939
|Engineering Index Backfile | 1939
|Planning Pennsylvania Turnpike
Engineering Index Backfile | 1940
|