A platform for research: civil engineering, architecture and urbanism
Station on Cattewater will have capacity of 189,000 kw; present installation consists of three 31,500-kw turbo-alternators and three pulverized coal fired boilers; foundations of power house are carried down to bedrock; structure is riveted steel framework; external walls are 13 1/2 in. brickwork.
Station on Cattewater will have capacity of 189,000 kw; present installation consists of three 31,500-kw turbo-alternators and three pulverized coal fired boilers; foundations of power house are carried down to bedrock; structure is riveted steel framework; external walls are 13 1/2 in. brickwork.
Plymouth `B' power station
Instn Civ Engrs -- Proc
Richardson, L. (author)
1954
4 pages
Supp Plate
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Design of eastern approach Viaduct and Coach station, Plymouth
Engineering Index Backfile | 1958
|British Library Online Contents | 2003
|Plymouth feels the love - Why Plymouth celebrates Love Parks Week
Online Contents | 2011
British Library Online Contents | 2012
|