A platform for research: civil engineering, architecture and urbanism
Roof framing over playing floor of new Senior High School gymnasium at Greensboro, NC, consists of seven concrete girders, clear span 118 ft, supported by 18 by 24-in. concrete columns spaced 20 ft apart; girders are prestressed by post tensioning method. (See also Eng News-Rec v 152 n 3 Jan 21 1954 p 36-8)
Roof framing over playing floor of new Senior High School gymnasium at Greensboro, NC, consists of seven concrete girders, clear span 118 ft, supported by 18 by 24-in. concrete columns spaced 20 ft apart; girders are prestressed by post tensioning method. (See also Eng News-Rec v 152 n 3 Jan 21 1954 p 36-8)
Prestressed roof girders set span record
Concrete
Shea, W.D. (author)
Concrete ; 62
1954
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Prestressed roof girders set span record
Engineering Index Backfile | 1954
|Prestressed concrete girders Span College Hall
Engineering Index Backfile | 1953
|Prestressed concrete girders Span College Hall
Engineering Index Backfile | 1953
|Prestressed concrete girders Span College Hall
Engineering Index Backfile | 1953
|Precast girders support long-span roof
Engineering Index Backfile | 1952