A platform for research: civil engineering, architecture and urbanism
Example of rehabilitation and salvaging of existing pavement, 13.58 mi long; pavement is widened with 4 to 6 ft of 12-in. crushed aggregate base course and bituminous surfacing; similar procedure with detailed cost data on 4.88-mi road.
Example of rehabilitation and salvaging of existing pavement, 13.58 mi long; pavement is widened with 4 to 6 ft of 12-in. crushed aggregate base course and bituminous surfacing; similar procedure with detailed cost data on 4.88-mi road.
Making modern highways in Pennsylvania
Pub Works
Schmidt, E.L. (author)
Public Works ; 85
1954
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
UB Braunschweig | 1928
|Engineering Index Backfile | 1913
Engineering Index Backfile | 1939
|New laboratory for Pennsylvania department of highways
Engineering Index Backfile | 1930
|Low-cost I-beam bridges for Pennsylvania highways
Engineering Index Backfile | 1933