A platform for research: civil engineering, architecture and urbanism
Productive capacity of postwar equipment
Review of specifications, field problems, job methods and equipment used to grade 88-mi, 2-lane, West Virginia Turnpike south from Charleston; over 2000 machines listed are used for clearing, excavation, embankment, culverts, drainage, and substructures for 72 bridges; illustrated description of work and equipment.
Productive capacity of postwar equipment
Review of specifications, field problems, job methods and equipment used to grade 88-mi, 2-lane, West Virginia Turnpike south from Charleston; over 2000 machines listed are used for clearing, excavation, embankment, culverts, drainage, and substructures for 72 bridges; illustrated description of work and equipment.
Productive capacity of postwar equipment
Roads Streets
McKeever, H.J. (author)
Roads and Streets ; 96
1953
14 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Postwar firing equipment and methods
Engineering Index Backfile | 1944
|Gas Industry Increases Productive Capacity
Online Contents | 1994
Postwar picture in construction equipment industry
Engineering Index Backfile | 1945
|Capacity of highway contractor to execute postwar highway program
Engineering Index Backfile | 1944
|British Library Online Contents | 2015
|