A platform for research: civil engineering, architecture and urbanism
Higher berse reservoir scheme of Wrexham and East Denbighshire water company
Development of Wrexham Waterworks since 1864; consumption increased from 1.36 mgd in 1939 to 2.27 mgd in first half of 1952; scheme has three main items; Packsaddle pumping station, covered Higher Berse Service Reservoir with 2 mg capacity, and trunk main; reservoir is constructed with colloidal grout concrete.
Higher berse reservoir scheme of Wrexham and East Denbighshire water company
Development of Wrexham Waterworks since 1864; consumption increased from 1.36 mgd in 1939 to 2.27 mgd in first half of 1952; scheme has three main items; Packsaddle pumping station, covered Higher Berse Service Reservoir with 2 mg capacity, and trunk main; reservoir is constructed with colloidal grout concrete.
Higher berse reservoir scheme of Wrexham and East Denbighshire water company
Water Water Eng
1954
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reclamation of Brymbo Steelworks, Wrexham
British Library Conference Proceedings | 2003
|Online Contents | 2013
Wrexham and its municipal works
Engineering Index Backfile | 1912
|Tŷ Pawb, Wrexham by Featherstone Young
British Library Online Contents | 2018
|Petrarch panels specified in Wrexham, and stone cladding
British Library Online Contents | 2009