A platform for research: civil engineering, architecture and urbanism
Prestressed deck proves cheapest for New Hoboken Pier
Pier, 700 ft long, 328 ft wide, supports transit shed 683 by 286 ft, and is of prestressed concrete supported on steel H-piles; shed has truck and rail access; it is of steel frame and has prestressed concrete deck of pretensioned stringers and post-tensioned pilecap bents; piles are protected cathodically.
Prestressed deck proves cheapest for New Hoboken Pier
Pier, 700 ft long, 328 ft wide, supports transit shed 683 by 286 ft, and is of prestressed concrete supported on steel H-piles; shed has truck and rail access; it is of steel frame and has prestressed concrete deck of pretensioned stringers and post-tensioned pilecap bents; piles are protected cathodically.
Prestressed deck proves cheapest for New Hoboken Pier
Civ Eng (NY)
Blaschke, T.O. (author) / Hopkins, D.A. (author)
1954
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Alternate design proves economy of precast, prestressed design for pier shed
Engineering Index Backfile | 1964
|British Library Online Contents | 2002
|Calculation Analysis on the Prestressed Pier
British Library Conference Proceedings | 2013
|