A platform for research: civil engineering, architecture and urbanism
New York's Pier 57 was concreted during Nov 1951 through Mar 1953 despite near zero temperatures; concrete was placed at 60 F and steam cured with no loss of time or ultimate strength.
New York's Pier 57 was concreted during Nov 1951 through Mar 1953 despite near zero temperatures; concrete was placed at 60 F and steam cured with no loss of time or ultimate strength.
Pier 57 concreted through winter
Am Concrete Inst -- J
Morris, M.D. (author)
1953
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Thin bridge floors concreted in Vermont winter
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1929
|Engineering Index Backfile | 1926
|Bearing capacity of deep concreted footings
Engineering Index Backfile | 1958
|Apparatus for curing the concreted surface under thekeeping warmth in the winter season
European Patent Office | 2022