A platform for research: civil engineering, architecture and urbanism
Installation of blowout preventer on well TJ-187 located 7 1/2 km from shore in Lake Maracaibo, where water is 48 ft deep; installation of preventer was complicated by unexpected blowout; details on operation are given.
Installation of blowout preventer on well TJ-187 located 7 1/2 km from shore in Lake Maracaibo, where water is 48 ft deep; installation of preventer was complicated by unexpected blowout; details on operation are given.
Blowout!
World Oil
Pitman, M.R. (author)
World Oil ; 139
1954
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
BLOWOUT PANEL OPENING DEVICE AND METHOD FOR OPERATING BLOWOUT PANEL
European Patent Office | 2021
|