A platform for research: civil engineering, architecture and urbanism
For St. Louis union station [midline ellipsis] mechanized mail handling
New facilities, built at cost of $4,200,000, have motor driven conveyors totaling 1 1/4 mi in length, inclined primary sorting tables 110 ft long, seven saw tooth secondary sorting docks, and 13 track mail car shed covering 1.2 acres; 952,000 sacks of mail move through station weekly; brick, steel and concrete building is fireproof structure with length of 208 ft and depth of 120 ft.
For St. Louis union station [midline ellipsis] mechanized mail handling
New facilities, built at cost of $4,200,000, have motor driven conveyors totaling 1 1/4 mi in length, inclined primary sorting tables 110 ft long, seven saw tooth secondary sorting docks, and 13 track mail car shed covering 1.2 acres; 952,000 sacks of mail move through station weekly; brick, steel and concrete building is fireproof structure with length of 208 ft and depth of 120 ft.
For St. Louis union station [midline ellipsis] mechanized mail handling
Ry Age
Railway Age ; 135
1953
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Weather [midline ellipsis] waves [midline ellipsis] and offshore oil
Engineering Index Backfile | 1957
|Roadbuilding [midline ellipsis] 1939 accomplishments [midline ellipsis] 1940 budgets and outlook
Engineering Index Backfile | 1940
[midline ellipsis] for duration
Engineering Index Backfile | 1942
Engineering Index Backfile | 1945