A platform for research: civil engineering, architecture and urbanism
Tunnel and power-house excavation at Kemano, B.C., for alcan hydro power
Excavation and driving methods in construction of 10-mi 25-ft horseshoe tunnel, two penstocks that plunge down deep inside at angle of 48° from horizontal, powerhouse cavern 120 ft high, 80 ft wide and 700 ft long, and access tunnels; geology of region; information on mechanized equipment and performance. (see also Western Miner v 27 n 7 July 1954 p 35-45)
Tunnel and power-house excavation at Kemano, B.C., for alcan hydro power
Excavation and driving methods in construction of 10-mi 25-ft horseshoe tunnel, two penstocks that plunge down deep inside at angle of 48° from horizontal, powerhouse cavern 120 ft high, 80 ft wide and 700 ft long, and access tunnels; geology of region; information on mechanized equipment and performance. (see also Western Miner v 27 n 7 July 1954 p 35-45)
Tunnel and power-house excavation at Kemano, B.C., for alcan hydro power
Can Min Met Bul
Matthias, F.T. (author) / Abrahamson, C.W. (author)
1953
19 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Tunnel and power-house excavation at Kemano, B.C., for alcan hydro power
Engineering Index Backfile | 1954
|Kemano tunnel repairs -- Final report
Engineering Index Backfile | 1962
|Nechako-Kemano-Kitimat project
Engineering Index Backfile | 1952
|Inspection of the Tunnel at the Kemano Project
British Library Online Contents | 2013
|Project: Kemano Completion Project
Online Contents | 1994