A platform for research: civil engineering, architecture and urbanism
Shutter-weir on Upper Seine
Extensive river-regulation works are in progress on Upper Seine between Paris and Montereau; replacement of existing needle weir at Vives-Eaux by shutter weir of improved type, due to AUBERT; shutters are manipulated wholly by power, and only one attendant is required. (See also Engineering vol. 132, n 3421 Aug. 7, 1931, p. 166, 8 figs. partly on pp. 167 and 170; Dock and Harbor Authority, vol. 11, no. 126, Apr. 1931, pp. 163-166, 9 figs.; also French description in Annales des Travaux Publics de Belgique, vol. 31, no. 5, Oct. 1930, pp. 725-774)
Shutter-weir on Upper Seine
Extensive river-regulation works are in progress on Upper Seine between Paris and Montereau; replacement of existing needle weir at Vives-Eaux by shutter weir of improved type, due to AUBERT; shutters are manipulated wholly by power, and only one attendant is required. (See also Engineering vol. 132, n 3421 Aug. 7, 1931, p. 166, 8 figs. partly on pp. 167 and 170; Dock and Harbor Authority, vol. 11, no. 126, Apr. 1931, pp. 163-166, 9 figs.; also French description in Annales des Travaux Publics de Belgique, vol. 31, no. 5, Oct. 1930, pp. 725-774)
Shutter-weir on Upper Seine
Civil Eng. (Lond.)
1931
4 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1902
|Engineering Index Backfile | 1931
|