A platform for research: civil engineering, architecture and urbanism
May 20 1931 n 389 p 206-209: Review of British practice relating to water-supply tunnels, including surveying methods for tunnel construction; alignment of tunnels; alignment on surface; setting out lines. June 20 n 390 p 251-258: Alignment below ground; driving tunnel. Aug. 20 n 393 p 432-435: Lining of tunnels; transverse sections of various waterworks tunnels; brick lining for facing.
May 20 1931 n 389 p 206-209: Review of British practice relating to water-supply tunnels, including surveying methods for tunnel construction; alignment of tunnels; alignment on surface; setting out lines. June 20 n 390 p 251-258: Alignment below ground; driving tunnel. Aug. 20 n 393 p 432-435: Lining of tunnels; transverse sections of various waterworks tunnels; brick lining for facing.
Waterworks construction
Water Water Eng
Barnett, M.R. (author)
1931
26 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of waterworks dams
Engineering Index Backfile | 1928
Construction of Cumberland (Md.) waterworks
Engineering Index Backfile | 1915
|Reinforced-concrete as applied to waterworks construction
Engineering Index Backfile | 1916
|