A platform for research: civil engineering, architecture and urbanism
Calderwood hydroelectric development of Aluminium Co. of America on Little Tennessee River; construction of 26-ft. pressure tunnel 2400 ft. long with 12-in. concrete lining; concrete materials and tests; placing operations; two electric tampers were run intermittently during placing operations; grouting; tunnel concrete strengths at 28 days. (See also - (discussion), vol. 3, no. 4, Dec., pp. 273-274)
Calderwood hydroelectric development of Aluminium Co. of America on Little Tennessee River; construction of 26-ft. pressure tunnel 2400 ft. long with 12-in. concrete lining; concrete materials and tests; placing operations; two electric tampers were run intermittently during placing operations; grouting; tunnel concrete strengths at 28 days. (See also - (discussion), vol. 3, no. 4, Dec., pp. 273-274)
Concreting Calderwood tunnel
Am. Concrete Inst. -- Jl
Johnson, W.R. (author)
1931
14 pages
11 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1935
|ASCE | 2021
|Concreting west Delaware tunnel
Engineering Index Backfile | 1960
|Engineering Index Backfile | 1946