A platform for research: civil engineering, architecture and urbanism
Concrete bulkheads for Creek Channel improve Jacksonville swamp area
$500,000 waterway built of precast sidewall, floor strut and balustrade units changing unsightly Hogans Creek swamp into park; porous channel bottom permits underground drainage; casting of concrete units.
Concrete bulkheads for Creek Channel improve Jacksonville swamp area
$500,000 waterway built of precast sidewall, floor strut and balustrade units changing unsightly Hogans Creek swamp into park; porous channel bottom permits underground drainage; casting of concrete units.
Concrete bulkheads for Creek Channel improve Jacksonville swamp area
Eng. News-Rec
Engineering News-Record ; 106
1931
3 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Bulkheading McCoy's creek in Jacksonville, fla
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1887
Precast concrete bulkheads and sea walls
Engineering Index Backfile | 1927
|Reducing the cost of concrete bulkheads
Engineering Index Backfile | 1924
|Engineering Index Backfile | 1911
|