A platform for research: civil engineering, architecture and urbanism
Well-planned schedules speed subway track construction
Methods used on new subway in New York City; adoption of concrete type of track throughout; methods of getting material into subway; inspection of materials.
Well-planned schedules speed subway track construction
Methods used on new subway in New York City; adoption of concrete type of track throughout; methods of getting material into subway; inspection of materials.
Well-planned schedules speed subway track construction
Elec. Ry. Jl
Jacobs, R.H. (author)
1931
3 pages
11 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Subway monolithic track bed turnout construction process
European Patent Office | 2020
|Adjustable measuring frame for subway track construction
European Patent Office | 2023
|Subway tunnel embedded track scattered paving construction method
European Patent Office | 2023
|