A platform for research: civil engineering, architecture and urbanism
Step-by-step field methods salvaging power shovel that fell down slope
Illustrated description of salvaging of overturned shovel weighing 34 tons after 70-ft. slide down slope of earth fill.
Step-by-step field methods salvaging power shovel that fell down slope
Illustrated description of salvaging of overturned shovel weighing 34 tons after 70-ft. slide down slope of earth fill.
Step-by-step field methods salvaging power shovel that fell down slope
Construction Methods
George, A.N. (author)
Construction Methods ; 13
1931
2 pages
9 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.