A platform for research: civil engineering, architecture and urbanism
Horseshoe-section tunnel for gravity sewer and other utilities
Construction operations on tunnel 6800 ft. long in West Orange, New Jersey.
Horseshoe-section tunnel for gravity sewer and other utilities
Construction operations on tunnel 6800 ft. long in West Orange, New Jersey.
Horseshoe-section tunnel for gravity sewer and other utilities
Contractors Engrs. Monthly
1931
4 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Gravity Sewer Tunnel Liner Corrosion Protection
British Library Conference Proceedings | 2011
|The North Western Sewer Tunnel Project - Section 3
British Library Conference Proceedings | 1999
|Rock section of tunnel and open cut sewer
Engineering Index Backfile | 1931
Structural design of closely packed horseshoe-shaped sewer linings during installation
Online Contents | 1999
|Online Contents | 1997