Central proportioning, 2-in. hose, steel forms, material pipes driven through ground, and other new methods adopted in construction and lining of sewer tunnel of horseshoe section, 12 by 12 ft. inside dimension, 1 mi. long, of which 1500 ft. is in quicksand.
Central proportioning, 2-in. hose, steel forms, material pipes driven through ground, and other new methods adopted in construction and lining of sewer tunnel of horseshoe section, 12 by 12 ft. inside dimension, 1 mi. long, of which 1500 ft. is in quicksand.
Gunite lining for Montreal tunnel sewer
Can. Engr
Guthrie, K.O. (author)
Canadian Engineer ; 61
1931
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Sewer restored by gunite process
Engineering Index Backfile | 1964
|Engineering Index Backfile | 1952
|Make use of Grout and Gunite in repair of tunnel lining
Engineering Index Backfile | 1927
Repairing tunnel linings with gunite
Engineering Index Backfile | 1918
Job-made cutter digs and trims canal for gunite lining
Engineering Index Backfile | 1947
|