A platform for research: civil engineering, architecture and urbanism
Measuring quantities in high-bank highway construction
In Colorado River Canyon cross-sectioning, to secure higher points, level was replaced by transit, successive shots being taken at various changes in section.
Measuring quantities in high-bank highway construction
In Colorado River Canyon cross-sectioning, to secure higher points, level was replaced by transit, successive shots being taken at various changes in section.
Measuring quantities in high-bank highway construction
Eng. News-Rec.
Hinman, R. (author)
Engineering News-Record ; 107
1931
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Electronic computing of highway quantities
Engineering Index Backfile | 1958
|Highway construction measuring equipment with high stability
European Patent Office | 2022
|Methods of measuring quantities
Engineering Index Backfile | 1930
|