A platform for research: civil engineering, architecture and urbanism
22-mile brick paved Akron-canton superhighway
Procedure followed in construction of brick pavement on heavy concrete base 40 ft. wide; longitudinal contraction joints were spaced at 10-ft. intervals; transverse joints at 40-ft. intervals 2-in. depth; bumpometer used in checking surface.
22-mile brick paved Akron-canton superhighway
Procedure followed in construction of brick pavement on heavy concrete base 40 ft. wide; longitudinal contraction joints were spaced at 10-ft. intervals; transverse joints at 40-ft. intervals 2-in. depth; bumpometer used in checking surface.
22-mile brick paved Akron-canton superhighway
Roads Streets
Sours, H.G. (author)
Roads and Streets ; 71
1931
5 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
Engineering Index Backfile | 1910
|Engineering Index Backfile | 1928
Engineering Index Backfile | 1921
A country road paved with brick
Engineering Index Backfile | 1897
|