A platform for research: civil engineering, architecture and urbanism
Structure to provide easy access from promenade at top of 120-ft. high cliffs to beach below, consisting of tunnel 221 ft. long and vertical shaft 112 ft. deep; elevator equipment and methods of control.
Structure to provide easy access from promenade at top of 120-ft. high cliffs to beach below, consisting of tunnel 221 ft. long and vertical shaft 112 ft. deep; elevator equipment and methods of control.
Construction of a cliff lift at Whitby
Instn. Mun. and County Engrs. -- Jl
Seward, J.R. (author)
1931
11 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
An approach to assessing risk on a protected coastal cliff: Whitby, UK
British Library Conference Proceedings | 2002
|British Library Online Contents | 2002
|Multifamily construction avoids cliff
British Library Online Contents | 2000