A platform for research: civil engineering, architecture and urbanism
Design and construction of 57,000 hp. unit added to Spier Falls plant; required capacity of over 7000 sec. ft. made dimensions of this Francis turbine largest yet built; by-passing of trash and ice; model tests of forebay; provision for scroll-case deformation; tailrace excavated to increase head; Tainter gates and flashboards. (See also - (discussions) in no. 8, May, p. 740, no. 9, July, pp. 947-948, and no. 10 Sept., p. 1136, 2 figs.)
Design and construction of 57,000 hp. unit added to Spier Falls plant; required capacity of over 7000 sec. ft. made dimensions of this Francis turbine largest yet built; by-passing of trash and ice; model tests of forebay; provision for scroll-case deformation; tailrace excavated to increase head; Tainter gates and flashboards. (See also - (discussions) in no. 8, May, p. 740, no. 9, July, pp. 947-948, and no. 10 Sept., p. 1136, 2 figs.)
Record hydro-electric turbine installed
Civil Eng. (N. Y.)
Hogan, J.P. (author)
1931
5 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New turntable installed in record time
Engineering Index Backfile | 1924
British Library Conference Proceedings | 1993
|Selection of optimum reservoir volume and installed capacity for hydro stations
Tema Archive | 1975
|Tainter gates of record size installed in Spanish Dam
Engineering Index Backfile | 1950
|