A platform for research: civil engineering, architecture and urbanism
Simplification emphasized in Morony design
A Morony plant of Montana Power Company; equipment is minimized but ample and is conveniently arranged; power house building, while 165 by 88 ft. in plan and 60 ft. high above tail water elevation, is just large enough to house two 22,500 kw. generating units and their immediately associated auxiliary and control equipment; upper extremities of generator housings project through roof and related air washers are on roof.
Simplification emphasized in Morony design
A Morony plant of Montana Power Company; equipment is minimized but ample and is conveniently arranged; power house building, while 165 by 88 ft. in plan and 60 ft. high above tail water elevation, is just large enough to house two 22,500 kw. generating units and their immediately associated auxiliary and control equipment; upper extremities of generator housings project through roof and related air washers are on roof.
Simplification emphasized in Morony design
Elec. West
Cochrane, H.H. (author)
Electrical West ; 66
1931
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Tainter Gate Inspection for the FERC Part 12 Inspection of Morony Dam
British Library Conference Proceedings | 2000
|Winter work emphasized at concrete meeting
Engineering Index Backfile | 1934
Architectural details emphasized in bascule-span bridge
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1932
|Recently Emphasized Objectives and Risk Analysis for Project Planning in Developing Countries
British Library Conference Proceedings | 1996
|