A platform for research: civil engineering, architecture and urbanism
Report on the construction of hydro-electric power plant at the Koguchi-gawa, Toyama-Ken
Design and construction of plant including welded steel penstock 1502 m. long, 900 to 1200 mm. in diam., operating under head of 658 m.; penstock specifications; design and construction of reinforced-concrete slab dam over 200 ft. long, 70 ft. high. (In Japanese.)
Report on the construction of hydro-electric power plant at the Koguchi-gawa, Toyama-Ken
Design and construction of plant including welded steel penstock 1502 m. long, 900 to 1200 mm. in diam., operating under head of 658 m.; penstock specifications; design and construction of reinforced-concrete slab dam over 200 ft. long, 70 ft. high. (In Japanese.)
Report on the construction of hydro-electric power plant at the Koguchi-gawa, Toyama-Ken
Civil Eng. Soc. -- Jl
Tsuchiya, S. (author)
1931
21 pages
33 Figs. supp. on plate
Article (Journal)
Japanese
© Metadata Copyright Elsevier B. V. All rights reserved.
Report on construction work of jiuso-bashi across shinyodo-gawa
Engineering Index Backfile | 1932
|Design of superstructure of chikugo-gawa railway bridge
Engineering Index Backfile | 1935
|Designs of Bridges in the Hirose-gawa Area Determined by Competition
British Library Conference Proceedings | 2015
|British Library Online Contents | 1996
Contemporary Glass Triennial Toyama 2005 a report
British Library Online Contents | 2005
|