A platform for research: civil engineering, architecture and urbanism
Moving gold dredge overland
No. 2, 9-cu. ft. gold dredge of Hammon Consolidated Gold Fields Co. at Nome, Alaska, pulled from Little Creek to Center Creek, distance of 8000 ft.; bucket crane, ladder and spuds and stacker removed, leaving 2000 tons to be moved; average daily progress 240 ft. and maximum movement 380 ft., working 16 hr. per day.
Moving gold dredge overland
No. 2, 9-cu. ft. gold dredge of Hammon Consolidated Gold Fields Co. at Nome, Alaska, pulled from Little Creek to Center Creek, distance of 8000 ft.; bucket crane, ladder and spuds and stacker removed, leaving 2000 tons to be moved; average daily progress 240 ft. and maximum movement 380 ft., working 16 hr. per day.
Moving gold dredge overland
Eng. Min. Jl
1931
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Moving 200-ton dredge overland to New Panama Canal lock site
Engineering Index Backfile | 1941
Device for overland transport of a suction dredge
Springer Verlag | 1985
|Device for overland transport of a suction dredge
Online Contents | 1985
|Engineering Index Backfile | 1937
Engineering Index Backfile | 1964