A platform for research: civil engineering, architecture and urbanism
New fish dock for Grimsby
Dock will be formed by building of river embankment 6800 ft. long; northeast wall will be formed by embankment, which will, for greater part of its length, be parallel with river embankment at distance of 340 ft. from it; cores of embankments will be composed of chalk mounds; works for new dock will include formation of two coaling jetties, one 238 and other 400 ft. long, and two outfitting jetties, one 270 and other 400 ft. long; scheme includes formation of very considerable length of new railway sidings.
New fish dock for Grimsby
Dock will be formed by building of river embankment 6800 ft. long; northeast wall will be formed by embankment, which will, for greater part of its length, be parallel with river embankment at distance of 340 ft. from it; cores of embankments will be composed of chalk mounds; works for new dock will include formation of two coaling jetties, one 238 and other 400 ft. long, and two outfitting jetties, one 270 and other 400 ft. long; scheme includes formation of very considerable length of new railway sidings.
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1934
Engineering Index Backfile | 1934
Engineering Index Backfile | 1934
|British Library Online Contents | 1995