A platform for research: civil engineering, architecture and urbanism
Placing 350,000 cubic yards of concrete in ariel dam
Construction of concrete arch dam having max. height of 313 ft. above foundation which is as deep as 125 ft. below stream bed; final location based on 26,000 ft. of drill-hole exploration. (Anonymous description) (See also Concrete vol. 38, no. 3, Mar. 1931 pp. 13-16, 3 figs.)
Placing 350,000 cubic yards of concrete in ariel dam
Construction of concrete arch dam having max. height of 313 ft. above foundation which is as deep as 125 ft. below stream bed; final location based on 26,000 ft. of drill-hole exploration. (Anonymous description) (See also Concrete vol. 38, no. 3, Mar. 1931 pp. 13-16, 3 figs.)
Placing 350,000 cubic yards of concrete in ariel dam
Eng. News-Rec
Scott, W.A. (author)
Engineering News-Record ; 106
1931
4 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Placing 350,000 cubic yards of concrete in ariel dam
Engineering Index Backfile | 1931
|Placing 300,000 cubic yards of concrete
Engineering Index Backfile | 1914
A 350,000-volt testing transformer
Engineering Index Backfile | 1922
|20,000 cubic yards of concrete in new government printing office
Engineering Index Backfile | 1957
Caballo dam on Rio Grande to store 350,000 ac ft
Engineering Index Backfile | 1936