A platform for research: civil engineering, architecture and urbanism
Labor and material costs on form work. Aug n 2 p 21-22: Taking off bar reinforcement; cost of placing steel; price differential on smaller sizes; finishing exposed surfaces; cost of floor finish. Sept n 3 p 21-22: Concreting plant; cold-weather expense; insurance; estimated costs. Oct n 4 p 9-12, 2 figs: Estimate for 5-story reinforced-concrete garage building. (See also - v 38 n 6 June 1931 n 6 p 14-16)
Labor and material costs on form work. Aug n 2 p 21-22: Taking off bar reinforcement; cost of placing steel; price differential on smaller sizes; finishing exposed surfaces; cost of floor finish. Sept n 3 p 21-22: Concreting plant; cold-weather expense; insurance; estimated costs. Oct n 4 p 9-12, 2 figs: Estimate for 5-story reinforced-concrete garage building. (See also - v 38 n 6 June 1931 n 6 p 14-16)
Estimating cost of concrete work
Concrete
Allen, L.H. (author)
Concrete ; 39
1931
4 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Estimating the cost of plain concrete work
Engineering Index Backfile | 1922
|Estimating the cost of plain concrete work in buildings
Engineering Index Backfile | 1922
|Cost estimating for bituminous concrete
Engineering Index Backfile | 1950
|Estimating cost of concrete structures
Engineering Index Backfile | 1966
|Estimating the cost of earthwork and concrete construction
Engineering Index Backfile | 1914
|