A platform for research: civil engineering, architecture and urbanism
Galloway rapids bridge, Prince Rupert
Construction of bridge consisting of creosoted timber trestle approaches at either end with 200-ft. creosoted through Howe truss center span set on concrete piers; truss was floated into position on scows; example of laminated chord adopted by Department of Public Works.
Galloway rapids bridge, Prince Rupert
Construction of bridge consisting of creosoted timber trestle approaches at either end with 200-ft. creosoted through Howe truss center span set on concrete piers; truss was floated into position on scows; example of laminated chord adopted by Department of Public Works.
Galloway rapids bridge, Prince Rupert
Can. Engr
Williscroft, S.N. (author)
Canadian Engineer ; 61
1931
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Prince Rupert: Sulphur Terminal Agreements
British Library Online Contents | 1999
Engineering Index Backfile | 1918
|Hydraulic dredging trials at Prince Rupert, Canada
British Library Online Contents | 2005
Prince Rupert Corporation to Become CPA in May
British Library Online Contents | 1999
A Prince Among Ports - CEO Don Krusel has royal ambitions for Prince Rupert
Online Contents | 2004
|