A platform for research: civil engineering, architecture and urbanism
Construction of 6-lane highway bridge, at Seattle, having roadway 2956 ft. long, main span of 800 ft. and channel clearance of 135 ft.; deck cantilever type adopted; plaza development and concrete approaches; driving piles.
Construction of 6-lane highway bridge, at Seattle, having roadway 2956 ft. long, main span of 800 ft. and channel clearance of 135 ft.; deck cantilever type adopted; plaza development and concrete approaches; driving piles.
Lake union bridge completed
Civil Eng. (N. Y.)
McCrory, T.G. (author)
1931
3 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1932
|$5,500,000 bridge completed across lake pontchartrain
Engineering Index Backfile | 1928
Concrete bridge across lake Pontchartrain completed in record time
Engineering Index Backfile | 1957
|Engineering Index Backfile | 1961
Engineering Index Backfile | 1937
|