Pinned, precast struts simplify prestressed girder erection
Faced with necessity for speed in replacing vital logging bridge destroyed by floods in mountains of western Washington maximum use was made of precast and prestressed concrete elements to build new crossing in less than two months; new, 180-ft-long bridge is three span structure supported near one-third points by inclined, precast struts pinned at both ends.
Pinned, precast struts simplify prestressed girder erection
Faced with necessity for speed in replacing vital logging bridge destroyed by floods in mountains of western Washington maximum use was made of precast and prestressed concrete elements to build new crossing in less than two months; new, 180-ft-long bridge is three span structure supported near one-third points by inclined, precast struts pinned at both ends.
Pinned, precast struts simplify prestressed girder erection
Eng News -- Rec
Engineering News-Record ; 174
1965
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Test of prestressed precast lattice girder
Engineering Index Backfile | 1960
|Decked Precast and Prestressed Concrete Girder Bridges
British Library Conference Proceedings | 2004
|Continuity in Precast Prestressed Concrete Girder Bridges
British Library Conference Proceedings | 1994
|Curved Precast Prestressed Concrete Bridge Girder Systems
British Library Conference Proceedings | 2010
|