A platform for research: civil engineering, architecture and urbanism
Casting and pretensioning of girders of 100 ft span on prestressing bed composed of two I-shaped post-tensioned concrete girders which was set up at site is described; purlins and double-T flooring units for mezzanine floors were also pretensioned; description of erection of girders in place; girders were used for roofing three transit sheds.
Casting and pretensioning of girders of 100 ft span on prestressing bed composed of two I-shaped post-tensioned concrete girders which was set up at site is described; purlins and double-T flooring units for mezzanine floors were also pretensioned; description of erection of girders in place; girders were used for roofing three transit sheds.
Transit sheds for madras port trust
Indian Concrete J
Patel, N.T. (author)
1964
5 pages
Plate
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Port of stockton wharves and transit sheds
Engineering Index Backfile | 1933
|Mass rapid transit system, Madras: An overview
Online Contents | 1996
|Timber shell roofs for storage buildings and transit sheds
Engineering Index Backfile | 1960
|Go-downs and transit sheds -- Ctesiphon system of construction
Engineering Index Backfile | 1953
|Light reinforced-concrete wharfing used in the Port of Madras
Engineering Index Backfile | 1921
|