A platform for research: civil engineering, architecture and urbanism
Berliet-enterprise factory at Bourg-en-Bresse (France)
Use of tubular steel framework, steel panel roofing, and twin-leaf type aluminum-steel wall cladding permitted construction of 30,000 sq m building complex of Berliet motor vehicle plant in only 5 mo; erection of steel frame was carried out by eight-man team at rate of 260 tons/mo; wall cladding was completed in 2 1/2 mo by 20 men; description is presented of foundation, steel work, roofs, and claddings.
Berliet-enterprise factory at Bourg-en-Bresse (France)
Use of tubular steel framework, steel panel roofing, and twin-leaf type aluminum-steel wall cladding permitted construction of 30,000 sq m building complex of Berliet motor vehicle plant in only 5 mo; erection of steel frame was carried out by eight-man team at rate of 260 tons/mo; wall cladding was completed in 2 1/2 mo by 20 men; description is presented of foundation, steel work, roofs, and claddings.
Berliet-enterprise factory at Bourg-en-Bresse (France)
Acier-Stahl-Steel
Mayans, V. (author)
Acier-Stahl-Steel ; 30
1965
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Stéphane Aurel et Emmanuel Laurent - Réaménagement d'un stade à Bourg-en-Bresse.
Online Contents | 2008
Motorway A 39. Over 70 kilometres of pavements between Dole and Bourg-en-Bresse
Online Contents | 1999
|Motorway A 39. Over 70 kilometres of pavements between Dole and Bourg-en-Bresse
British Library Online Contents | 1999
|A 39 motorway - Dijon - Bourg-en-Bresse 1. Choisey - Arley section 2. Choisey - Colonne section
British Library Online Contents | 1997
|British Library Online Contents | 1997
|