A platform for research: civil engineering, architecture and urbanism
Thickened section at spring line provides shoulder to develop arch action in top half of pipe and water seal at joint; shot-in-place gunite construction of 3432 ft of 60-in. pipes for Santa Ana Valley Irrigation Co described and illustrated.
Thickened section at spring line provides shoulder to develop arch action in top half of pipe and water seal at joint; shot-in-place gunite construction of 3432 ft of 60-in. pipes for Santa Ana Valley Irrigation Co described and illustrated.
Improved gunite pipe for irrigation
Western Construction News
Browning, C.R. (author)
1949
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1945
Engineering Index Backfile | 1944
|Sewer restored by gunite process
Engineering Index Backfile | 1964
|Performance of Gunite Brow Ditches
British Library Online Contents | 1994
|